Home > Bocce Building Materials > Class II Road Base >

3/4" Class II Road Base Per Yard SuperEarth-Sack

Class II Road Base Per 1 Yard Bag
3/4" Class II Road Base
 
Alternative Views:


Call or Email us for a shipping quote
Price Per Yard $99.99
Home & Business Improvement Sale $62.99
Savings: $37.00
Special Instructions: Crushed rock
Custom Field 2: No experience needed for excellent results.
Custom Field 3: One day or less for most projects. Figure 15 minutes per 50 pound for a finished project.
Custom Field 4: Contractor grade wheelbarrow, landscape rake, heavy duty push broom, garden hose
Custom Field 5: Geo Textile Weed control fabric, wood, steel or plastic edging


Availability:: Usually Ships in 24 to 48 Hours
Product Code: 146RB340YRDB
Qty:

Description Material Transport Photos & Liability
 
3/4" Class II Road Base - Price Per Yard SuperEarth-Sack
Regional Quarry Production In All Service Locations - ASTM data available upon request.
For general engineering or large purchases go to our commercial section.

This is used in landscaping and hardscaping when installing very solid foundations for flagstone, paving stones, pavers, interlocking pavers and decomposed granite pathways. Easy to get heavy compaction with, Class II Road base is excellent for base applications in landscape construction projects. Made from a mixture of different sizes of crushed hard rock from 3/4" all the way down concrete sand.

Product Specifications and Uses
  • Uses:

  • Road Construction:
    Class 2 Road Base is commonly used as a foundational layer in road construction projects. It provides stability, support, and drainage for the upper layers of the road.
  • Driveways:
    This material is often used as a base layer for driveways due to its ability to withstand heavy loads and provide a solid foundation.
  • Bocce Ball Courts:
    Class 2 Road Base is also used in building bocce ball courts. It creates a stable and compact surface that helps with ball rolling and gameplay.

  • How to Use in Building a Bocce Ball Court:
    1. Site Preparation: Clear the area where the bocce ball court will be located. Ensure the ground is relatively level and free from debris.
    2. Excavation: Excavate the area to a depth of about 4-6 inches. This allows space for the road base layer and ensures proper compaction.
    3. Adding Class 2 Road Base: Spread a layer of 3/4" Class 2 Road Base evenly over the excavated area. The thickness of this layer will depend on the specific requirements of your court, but a 3-4 inch layer is generally suitable.
    4. Compaction: Use a compactor or roller to compact the road base layer. This helps in achieving a solid and stable surface. Compact in layers if necessary.

  • Coverage:
  • The coverage of 3/4" Class 2 Road Base varies based on the compaction achieved and the specific characteristics of the material. Generally,
    • A ton of this material can cover approximately 80 to 100 square feet when spread at a depth of 3 inches.
    • A cubic yard (which is equivalent to 1.25 tons) should cover around 100 to 120 square feet at a depth of 3 inches.

Share your knowledge of this product. Be the first to write a review »